Smart Energy Power Plant

Mingyang provides investment, development, and operation of clean energy power stations such as wind and hydrogen energy storage. It has a specialized platform for new energy project investment, innovative application scenarios, and strategic integration.
Leveraging a solid industry background, modern corporate management practices, globally leading technological advantages, and strong financial capabilities, the business spans over 20 provinces nationwide.
The company’s wind and photovoltaic projects under construction or in operation are distributed globally.

Service advantages

  • First-class project planning, design and construction capabilities
  • First-class project production and operation capacity
  • Innovative and efficient construction level
First-class project planning, design and construction capabilities
Scientific, standardized, lean and informationized
Overall planning and whole-process control
Overall planning and management of the whole life cycle of the project, taking the project construction plan as the source of value creation, taking the design as the leader, strengthening the process management, using the intelligent project management system, realizing the digitalization of business and process, and carrying out penetrating management of the project to ensure that the quality and safety of the project construction progress can be controlled.
Value creation, quality project
Formulate typical design standards for projects, take quality projects as management objectives, organize and plan scientifically, complete construction tasks with high standards, and take into account comprehensive ecological restoration projects to ensure green and civilized construction and ecological environment protection.
Standardize management and keep improving
On the basis of standardization, carry out lean action, sort out the pre-risk, study and judge the possible risk factors in the process of project construction in advance, formulate reasonable countermeasures, avoid and control risks, continuously optimize the project cost while ensuring the quality, safety and progress of the project, strive to reduce the cost of electricity, and realize the inclusiveness of renewable energy.
First-class project production and operation capacity
Mingyang has established a perfect safety management system, production management system and power marketing system for intelligent energy power plants, and comprehensively implemented standardization, standardization and information management.
Build an intelligent security management and control platform
Through face recognition and other technologies, remote collaborative monitoring of on-site work is carried out, safety management and control of on-site work is strengthened, real-time management of the whole process of operation at the station level, branch level and headquarters level is realized, and zero safety production accidents are guaranteed.
Build a production information management platform
Through data analysis, we can find out the potential problems of equipment, analyze the operation of station equipment in multiple dimensions, and improve the efficiency of equipment.
Development of auxiliary platform for electric power transaction
Through the modeling and analysis of meteorological data and power grid disclosure transaction data, the trading strategy for reference is formulated.
Innovative and efficient construction level
Mingyang has continuously upgraded its super-high tower technology, built 140 meters and 160 meters super-high steel structure mixed towers in Shanxian, Shandong Province and Lingbi, Anhui Province, and built the first wind power project of 170 meters precast concrete tower batch application in Luoshan, Henan Province, breaking through the technical barriers of the industry and fully tapping the power generation potential in low wind speed areas. At the same time, it has realized the improvement of power generation efficiency and the reduction of comprehensive construction cost, and has built a number of demonstration wind power projects. The follow-up will continue to explore tower technology, break through the ultra-high altitude field, and create more demonstration projects in the whole wind speed area.

Classic Cases

With advanced strategic vision and planning ability, Mingyang has planned and built new energy equipment manufacturing bases such as Yangjiang in Guangdong Province, Xinyang in Henan Province, Zhangjiakou in Hebei Province, Daqing in Heilongjiang Province and Changling in Jilin Province. It has built a number of benchmarking demonstration projects that have won national quality awards and projects that enrich people and benefit farmers, which have been recognized by the government and the industry. It has promoted local economic development and successfully explored the path of the clean energy GSP.
Jishanliang Substation 330kV
In 2018, Mingyang Power Station Business Group and Guodian, Datang, Huadian and other five units jointly invested in the construction of the first substation led by private enterprises in China-Jishanliang 330kV Substation in Jingbian, Shaanxi Province, covering an area of 32.26 mu. Jishanliang 330kV Substation is the key node for local new energy power generation and transmission, which greatly increases the power exchange capacity between Guanzhong and Northern Shaanxi, is of great significance for optimizing Shaanxi power grid structure and solving the problem of new energy power consumption in Northern Shaanxi, and vigorously promotes the healthy development of new energy industry in Northern Shaanxi.
Baotou Shiguai Industrial Park Source-Network-Load-Storage Integration Project
In July 2023, Inner Mongolia Mingyang Baotou Shiguai 200 MW photovoltaic centralized competition project was connected to the grid. The project is equipped with 200 MW photovoltaic power generation system, 70 MW wind power generation system, 54 MW \ 108 MWh energy storage system, and a hydrogen production system with a total production capacity of 1500 Nm3/H. It produces 523 million degrees of green electricity annually, drives 1.26 billion yuan of fixed assets investment, and provides 400000 tons of green electricity for industrial parks every year.
Mingyang Yangjiang Qingzhou Sihai Wind Farm Project
Offshore wind power projects with the longest offshore distance and the deepest water depth have been built in China, using 25 MySE11-230 units and 19 MySE12-242 units with a total installed capacity of 500 MW, which can provide about 1.83 billion kilowatt-hours of green power annually, save 570000 tons of standard coal and reduce sulfur dioxide emissions by 11000 tons. Reduce 1.4 million tons of carbon dioxide.
Lingbi 50MW Large Capacity Wind Power Project
For the first time in China, the 160-meter ultra-high steel-concrete tower project has been applied in batches, equipped with MySE4.0-166/173 wind turbines independently developed by Mingyang, which greatly improves the development space under low wind speed and high shear wind conditions in plain areas. As the first batch project of ultra-high steel-concrete tower in the domestic wind power industry, it adopts the friendly sectional design which is convenient, economical and suitable for transportation conditions in different regions, and has won the "China Wind Talent Pioneer Award".